At 09:24 I requested from Mr Gary D. from Zurich to let me know if any works will be done today and if yes the nature of those works.
I also mentioned that if the floor specialists decide to redo the floor preparation (which I believe is necessary) as per the manufacturer’s standards then I would expect the following:
1) All the old materials to be removed. Photo evidence (before and after) will be necessary.
2) BAL F76 to be re-installed in one day without further works taking place and photos (before and after) to be provided as evidence.
3) STOPGAP 300 HD to be installed at a subsequent day and photos to be provided.
At 10:41 Mr Gary D. replied to my email stating that: “The flooring contractors have been “stood down” today whilst GAB Robins complete their enquiries with F Ball & Co.
GAB Robins or I will be in contact with you later today. As discussed yesterday, I want to be able to provide you with a program of works at the earliest possible opportunity.”